top of page
20230317_190404000_iOS.heic

Our Work Speaks

Ever notice doors sticking or cracks forming as a structure settles? That’s often the result of rushed or poorly executed site preparation. At Integrated Concepts, we don’t cut corners—we build strong foundations from the ground up. Our precision excavation, grading, and utility work ensure every project, whether residential, commercial, or heavy civil, starts on solid ground. We make sure your site is stable, level, and ready to stand the test of time.

20230125_221754182_iOS.heic

Heavy Civil

EARHTWORKS

East Side Grading USA Pkwy

​

Performed mass grading operations, moving 3 million cubic yards of earth to develop large commercial-grade building pads. 

EARTHWORKS
HEAVY CIVIL - BUILDING PADS AND MASS GRADING PROJECT

West Side Grading USA Pkwy & Commercial Pads

Redwood Materials Building​s

HEAVY CIVIL EARTHWORKS
HEAVY CIVIL EARTHWORKS

Battery Blvd  USA Pkwy

Constructed off-ramps and installed traffic signal systems. 

HEAVY CIVIL PROJECT
UNDERGROUND UTILITIES

Tholl Drive Water Main Replacement

Replacement of Truckee Meadows Water Authority water main on Tholl Drive in Reno, NV. 

COMMERICIAL EARTHWORKS
logo_2025-10-08_16-48-38.jpeg

Commercial

COMMERICIAL RESTAURANT - GRADINGS, FOUNDATION, UNDERGROUND UTILITIES, GROUND UP

Darden - Yard House Restaurant

Site preparation and development for a new restaurant located at The Outlets at Legends in Sparks, Nevada.

DARDEN YARD HOUSE AT LEGENDS IN SPARKS, NV
COMMERCIAL BUILDING PADS AND SHELL PROJECT , RENO, NV

5th and Keystone Retail Pads 

The Keystone Retail Pad “H” project helped strengthen the West End Commons retail center as one of Reno’s newest premier retail destinations. The project consisted of a 3,120-square-foot shell building constructed for a future tenant.

​

Integrated Concepts, LLC performed the site preparation and development for the project. The building featured expansive storefront windows for natural light, a perimeter slab foundation to simplify future under-slab utilities, and three rooftop HVAC units for efficient climate control. Despite the small footprint and limited access in a high-traffic area, the project was successfully completed and delivered as a streamlined, adaptable retail shell.

118 West Street Apartments

Site preparation and site development for the renovation of a historical apartment building in downtown Reno, NV known as Colonial Apartments. 

COMMERICIAL EARTHWORKS AND UNDERGROUND UTILITIES PROJECT
SCUSSBOOM

Schussboom Brewing, Co. 

This project involved demolishing an existing building and dog park, installing underground utilities, performing site grading, and constructing a new parking lot complete with base and paving.

SCHUSSBOOM BREWERY

Virginia City Firehouse

New wash station for fire truck s- new building (storage building and wash base) for virignia city highlands fire station. 

Mill Street Building Pads

Constructed large-scale commercial tilt-up structures from the ground up, each spanning 200,000 square feet, fully prepared for occupancy.

Flex Building B - Clean Water Way 

Constructed large-scale commercial tilt-up structure from the ground up, spanning 200,000 square feet, fully prepared for occupancy.

20240802_044147525_iOS.heic

Residential

RESIDENTIAL LANDSCAPING PROJECT

Smith Residence

Private

Grace Residence

Private

BACKYARD LANDSCAPING, HARD SCAPING AND POOL PROJECT
BACKYARD POOL PROJECT - CUSTOM RESIDENTIAL

Beam Residence

Private

Eagle Falls Drive

Private

CUSTOM RESIDENTIAL - BACKYARD PAVERS AND LANDSCAPING

Sweet Residence 

Private

PRIVATE RESIDENCE PROJECT

Triple Crown 

Private Custom Home – New Construction from the Ground Up

bottom of page